Project Brief
Avenues Mall Riyadh
| Project Detail | Information |
| Location | Riyadh, Saudi Arabia |
| Client | Shomoul |
| Category | Commercial & Hospitality |
| Status | Completed |
| Project Duration | 6 Months |
| Project Area | 50,000 m² |
| Scope | Paving Installation |
About the Project
The Avenue Riyadh is a 50,000 m² commercial and hospitality development in Riyadh, delivered for Shomoul. The Landscape Company was engaged for the hardscape phase of the project, with a scope centred on paving installation across the site. Completed within a six-month duration, the project reflects the scale of coordination required when paving forms the primary ground surface for a development of this size.
Our Scope of Work
Our scope at The Avenue Riyadh was focused on paving installation across the 50,000 m² site. This covered the execution of the paved surfaces that make up the development’s ground plane, carried out in line with the project’s design and completed within the six-month timeframe. Rather than spanning multiple disciplines, our involvement was concentrated on getting this hardscape execution right at scale.
Challenges and Solutions
One of the main challenges on this project involved the design and dimensions of the paving itself, where accuracy across a large site becomes harder to maintain the bigger the footprint. To manage this, we assigned a professional draughtsman to the project and paired this with close site supervision throughout the installation, ensuring the paving design was executed correctly on the ground from start to finish.
Key Features of the Project
The paving works at The Avenue Riyadh made use of paving, tile adhesive grout (TAG), and mortar bed as the core materials for installation. Together, these formed the basis of the hardscape execution across the site.
FAQs
- What was The Landscape Company’s role at The Avenue Riyadh?
We delivered the paving installation works across the 50,000 m² site. - Where is The Avenue Riyadh located?
The project is located in Riyadh, Saudi Arabia. - How long did the project take to complete?
The paving works were completed within a six-month project duration. - What materials were used for the paving?
The works used paving, tile adhesive grout (TAG), and a mortar bed. - What was the main challenge on this project?
Managing the design and dimensions of the paving, which was addressed through a professional draughtsman and dedicated site supervision.