Tabuk Entertainment Complex i

Tabuk, KSA

13,762.00

Project Brief

Project Detail Information
Location Tabuk, Saudi Arabia
Client Seven Entertainment Complex
Category Commercial
Status Completed
Project Duration 2 Years
Project Area 10,000 m²
Scope Softscape, Irrigation, and Hardscape

About the Project

Seven Tabuk is a 10,000 m² commercial development delivered for Seven Entertainment Complex in Tabuk. The Landscape Company was engaged across the full landscape scope, covering softscape, irrigation, and hardscape works. The project ran over a two-year duration, reflecting the coordination required when planting, irrigation, and paving all form part of a single site.

Our Scope of Work

Our scope at Seven Tabuk covered irrigation system installation, planting, hardscape works, and street furniture. This meant managing the landscape as a complete system rather than a series of separate trades, with softscape and irrigation developed alongside the hardscape to support the site once complete. The combination of works reflects the scale of a commercial development where the ground plane, planting, and water delivery all need to function together.

Challenges and Solutions

The project carried a short-notice implementation timeline, which put pressure on how quickly softscape works could be established and maintained on site. To manage this, we assigned a dedicated team to carry out manual irrigation, ensuring the planting received consistent care during the period before automated systems could take over.

Key Features of the Project

The works at Seven Tabuk made use of paving, tile adhesive, tile grout, fertilizers, soil, and root barriers. These materials supported both the hardscape installation and the softscape establishment across the site, from surface paving to the planting beds beneath it.

FAQs

  1. What was The Landscape Company’s role at Seven Tabuk?
    We delivered softscape, irrigation, and hardscape works, including planting, irrigation systems, and street furniture.
  2. Where is Seven Tabuk located?
    The project is located in Tabuk, Saudi Arabia.
  3. How long did the project take to complete?
    The works were carried out over a two-year project duration.
  4. What materials were used on this project?
    The works used paving, tile adhesive, tile grout, fertilizers, soil, and root barriers.
  5. What was the main challenge on this project?
    A short-notice implementation timeline, addressed by assigning a dedicated team to manage irrigation manually.