Madinah Entertainment Complex

Madinah, KSA

21,008.00

Project Brief

Project Detail Information
Location Madinah, Saudi Arabia
Client Seven Entertainment Center
Category Commercial
Status Snag Phase
Project Duration 2 Years
Project Area 10,000 m²
Scope Softscape, Hardscape, and Water Feature

About the Project

Seven Madinah is a 10,000 m² commercial development in Madinah, delivered for Seven Entertainment Center. The Landscape Company’s scope on this project spans softscape, hardscape, and a water feature, making it one of the more layered projects in our portfolio. Now in its snag phase after a two-year duration, the project brings together planting, paved surfaces, and water elements within a single site.

Our Scope of Work

Our scope at Seven Madinah covers irrigation system installation, planting, hardscape, street furniture, and fountains. The hardscape and softscape works have been completed, while irrigation and the water features remain under construction. This combination reflects a project where the landscape functions as a connected system, with planting, paving, and water designed to work together rather than as separate elements.

Challenges and Solutions

A key challenge on this project involved redesign and material selection, which required the team to reassess elements of the works as the project progressed. Our team worked through these changes alongside the client to keep the project moving toward completion.

Key Features of the Project

The works at Seven Madinah made use of waterproofing membrane, tile adhesive and grout, fertilizer, soil, nozzles, and MEP pipes and fittings. This range of materials reflects the different systems involved on site, from the surface finishes to the irrigation and water feature infrastructure beneath them.

FAQs

  1. What was The Landscape Company’s role at Seven Madinah?
    We are delivering softscape, hardscape, and water feature works, including irrigation, planting, street furniture, and fountains.
  2. Where is Seven Madinah located?
    The project is located in Madinah, Saudi Arabia.
  3. What is the current status of the project?
    The project is in its snag phase, with hardscape and softscape completed and irrigation and water features still under construction.
  4. What materials were used on this project?
    The works use waterproofing membrane, tile adhesive and grout, fertilizer, soil, nozzles, and MEP pipes and fittings.
  5. What was the main challenge on this project?
    Redesign and material selection, which the team worked through alongside the client as the project progressed.

Lets discuss your inquiry